The actual lay of the land has changed a little at Boltorr Road.
I know this should take aeons, but it’s my universe so get used to it.
So, no track alignment changes, but the Boltorr Brook’s changed its course a little.
Now the Boltorr Reservoir Dam is under construction I’ll be able to consider the lay of the land east of the tracks soon. Construction of the bridge abutments is just starting on the Boltorr Brook’s railway bridge. Soon I’ll have to consider how to best represent moving water. Any ideas?